COUNCIL COST (section 94) – report
Type
residentialService
COUNCIL COST (section 94) – reportAddress
Bellevue Hill, NSWCost
$2.2m project costWe prepared a Cost Estimate Report (cost less than $750,000) and a Detailed Cost Report (cost greater than $750,000) for a client to fulfill his requirements with Woollahra Municipal Council. The project was to extend two houses and build a studio in Bellevue Hill NSW.
Our report assists to verify the genuine cost of the development in their Development Application (DA). We include industry recognised prices which considers cost of materials and labour for construction, demolition and GST. As part of Woollahra Council’s requirements, a cost estimate report and a detailed cost report must be prepared by a registered quantity surveyor.
We prepared two separate reports using council required templates, one house has a construction cost less than $750,000 which requires a Cost Estimate Report prepared by a registered quantity surveyor. While the second house cost more than $750,000 which requires a Detailed Cost Report prepared by a registered quantity surveyor.
We completed these two reports within 4 days, which assisted our clients short timeframe and prevented further delay in their DA.
$720k project cost (Building A)
$1.5m project cost (Building B)